Retired from office duty, Zephyr North‘s old fax machine does sterling duty testing phone lines at Cultus Wind Farm.
Tag: wind_farm
AWS OpenWIND
AWS OpenWIND is a free wind farm design tool. It’s from people who know what they’re doing. I’m intrigued.
maybe I shouldn’t play with HDR …
worse than no map at all
I’ve been using my GPS to track roads around the wind farm. I’m most disappointed with the coverage that Garmin’s MetroGuide Canada gives. Sure, Ashfield-Colborne-Wawanosh might not be Canada’s most vibrant metropolis, but it seems that much of the MetroGuide routing is screwy around the Huron shores. A couple of frinstances:
Hwy 21 around Goderich is about 100-300m of its location, and the junction from Hwy 8 is almost a kilometre out. The GPS does an amusing “Hey, make a turn … whoa, how’d you get here?” kind of thing as you come into Goderich.According to MetroGuide Canada, you are “Arriving at Lucknow” when you’re on Hwy 21. Lucknow’s almost 20km from Hwy 21. It also doesn’t seem to know about routing along Hwy 86, and also tries to route you across an entirely imaginary road near Belgrave Road.Visiting friends near Wingham last night, the GPS suggested I should go back to Goderich via Clinton, a detour of 20km.
I know I didn’t really need to use the GPS for this (except I now know how to navigate the backroads of Wingham), but some of the map choices it was giving me were downright useless.
Helps if you load the right map …
three sixty five
Happy first birthday, Kingsbridge Wind Power Project – commissioned a year ago today(ish). I hope there’s cake …
the anti-anti-windfarm backlash
Kids, this is neither big nor clever: Vandals target wind farm campaign
Cathkin gets a wind farm
A Glasgow housing scheme could become the site of the UK’s first community-owned urban wind farm, reports the BBC.
This is rather cool. Cathkin Braes is a windy place. Castlemilk needs money. Everyone’s happy.
Except, of course, for the dismal anti-windfarm people, Views of Scotland, who the BBC have to quote in order to appear fair and balanced. How can people who claim to be so concerned be so uninformed? F’rinstance, this from SWiM’s Bob Graham, in an anti-wind petition to the Scottish Parliament: Turbines from the current generation have a mean output of 2MW. However, because of their inefficiency and the random nature of the wind, no turbine has produced more than 27 per cent of its production capacity. That equates to just 0.25MW.
Notwithstanding that 27% of 2MW is 560kW, we can manage better capacity factors than that here in Toronto. Maybe I’ll phone Bob Graham every time we’re over his so-called production limit …