{"id":5740,"date":"2010-08-09T22:47:11","date_gmt":"2010-08-10T02:47:11","guid":{"rendered":"http:\/\/scruss.com\/blog\/?p=5740"},"modified":"2010-08-09T23:32:28","modified_gmt":"2010-08-10T03:32:28","slug":"offshore-wind-much-of-copenhagen-is-within-5km-of-offshore-wind-turbines","status":"publish","type":"post","link":"https:\/\/scruss.com\/blog\/2010\/08\/09\/offshore-wind-much-of-copenhagen-is-within-5km-of-offshore-wind-turbines\/","title":{"rendered":"Offshore Wind: much of Copenhagen is within 5km of offshore wind turbines"},"content":{"rendered":"<p>There&#8217;s a bit of a stooshie going on in Ontario renewables circles about a proposed 5km minimum shoreline setback for offshore wind turbines in the Great Lakes. This pretty much kills most projects through infrastructure costs \u00e2\u20ac\u201d deep lake foundations are expensive, as is submarine cable. <a title=\"desc\" href=\"http:\/\/www.ebr.gov.on.ca\/ERS-WEB-External\/displaynoticecontent.do?noticeId=MTA5OTIz&amp;statusId=MTY0OTkz&amp;language=en\">Please express your opposition<\/a>.<\/p>\n<p>I&#8217;ve flown over <a title=\"desc\" href=\"http:\/\/www.middelgrunden.dk\/middelgrunden\/?q=en\">Middelgrunden<\/a>, and found it to be an icon in Copenhagen&#8217;s harbour. With some freehand tracing in Google Earth and some minor GIS skills (hey, I&#8217;m <a href=\"http:\/\/glaikit.org\/\">learning<\/a>), here&#8217;s how much of Copenhagen is within 5km of the turbines:<\/p>\n<p><a href=\"http:\/\/scruss.com\/wordpress\/wp-content\/uploads\/2010\/08\/k\u00c3\u00b8benhavn.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-5741\" title=\"k\u00c3\u00b8benhavn showing 5km buffer from Middelgrunden\" src=\"http:\/\/scruss.com\/wordpress\/wp-content\/uploads\/2010\/08\/k\u00c3\u00b8benhavn-320x216.jpg\" alt=\"\" width=\"320\" height=\"216\" \/><\/a><\/p>\n<p>That looks like quite a lot; lots of homes and tourist attractions, and not just the harbour. If you want a closer look, here&#8217;s the buffer in KML format: <a href=\"http:\/\/scruss.com\/wordpress\/wp-content\/uploads\/2010\/08\/Middelgrunden-5km.kml\">Middelgrunden-5km.kml<\/a>.<\/p>\n<p><span style=\"text-decoration: line-through;\">I&#8217;m trying to find the location of the <a href=\"http:\/\/scruss.com\/blog\/2009\/03\/20\/a-little-bit-on-the-toronto-offshore-wind-farm-and-the-helimax-study\/#comment-128681\">turbine 500m from shore at Hooksiel<\/a>, but maybe it&#8217;s a bit new for Google Earth imagery.<\/span> Fixed that for me:<br \/>\n<a href=\"http:\/\/scruss.com\/wordpress\/wp-content\/uploads\/2010\/08\/hooksiel.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-5746\" title=\"hooksiel, showing 5km buffer\" src=\"http:\/\/scruss.com\/wordpress\/wp-content\/uploads\/2010\/08\/hooksiel-320x216.jpg\" alt=\"\" width=\"320\" height=\"216\" srcset=\"https:\/\/scruss.com\/wordpress\/wp-content\/uploads\/2010\/08\/hooksiel-320x216.jpg 320w, https:\/\/scruss.com\/wordpress\/wp-content\/uploads\/2010\/08\/hooksiel-160x108.jpg 160w, https:\/\/scruss.com\/wordpress\/wp-content\/uploads\/2010\/08\/hooksiel.jpg 992w\" sizes=\"auto, (max-width: 320px) 100vw, 320px\" \/><\/a><br \/>\nFile: <a href=\"http:\/\/scruss.com\/wordpress\/wp-content\/uploads\/2010\/08\/BARD-Hooksiel-5km-buffer.kml\">BARD Hooksiel 5km buffer.kml<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>There&#8217;s a bit of a stooshie going on in Ontario renewables circles about a proposed 5km minimum shoreline setback for offshore wind turbines in the Great Lakes. This pretty much kills most projects through infrastructure costs \u00e2\u20ac\u201d deep lake foundations are expensive, as is submarine cable. Please express your opposition. I&#8217;ve flown over Middelgrunden, and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[8],"tags":[2197,412,2195,2196,1540,147,59],"class_list":["post-5740","post","type-post","status-publish","format-standard","hentry","category-wind-things","tag-copenhagen","tag-denmark","tag-germany","tag-hooksiel","tag-offshore","tag-ontario","tag-wind"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/pQNZZ-1uA","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/posts\/5740","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/comments?post=5740"}],"version-history":[{"count":4,"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/posts\/5740\/revisions"}],"predecessor-version":[{"id":5744,"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/posts\/5740\/revisions\/5744"}],"wp:attachment":[{"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/media?parent=5740"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/categories?post=5740"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/tags?post=5740"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}