{"id":3613,"date":"2008-05-06T08:11:40","date_gmt":"2008-05-06T12:11:40","guid":{"rendered":"http:\/\/scruss.com\/blog\/2008\/05\/06\/la-belle-province\/"},"modified":"2008-05-06T08:11:40","modified_gmt":"2008-05-06T12:11:40","slug":"la-belle-province","status":"publish","type":"post","link":"https:\/\/scruss.com\/blog\/2008\/05\/06\/la-belle-province\/","title":{"rendered":"la belle province"},"content":{"rendered":"<p style=\"text-align: center\"><img decoding=\"async\" src=\"http:\/\/scruss.com\/wordpress\/wp-content\/uploads\/2008\/05\/2000mw_en.jpg\" alt=\"quebec wind projects\" \/><\/p>\n<p><a href=\"http:\/\/www.hydroquebec.com\/\">Hydro-Qu\u00c3\u00a9bec<\/a> <a href=\"http:\/\/www.hydroquebec.com\/4d_includes\/of_interest\/PcAN2008-053.htm\">announced<\/a> their wind RFP <a href=\"http:\/\/www.hydroquebec.com\/4d_includes\/depdoc\/cpe\/fr\/Tableau_Repartition_en.pdf\">winners<\/a> yesterday. It&#8217;s a huge deal for the industry; more than 2000 MW of contracts awarded, with commissioning dates ranging from 2011-2015. <a href=\"http:\/\/www.enercon.de\/\">Enercon<\/a> and <a href=\"http:\/\/www.repower.de\/\">REpower<\/a> won all the manufacturing; strict local content requirements mean that they will have to set up shop in Qu\u00c3\u00a9bec.<\/p>\n<p>This is good for the Canadian industry. Now the real work begins.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hydro-Qu\u00c3\u00a9bec announced their wind RFP winners yesterday. It&#8217;s a huge deal for the industry; more than 2000 MW of contracts awarded, with commissioning dates ranging from 2011-2015. Enercon and REpower won all the manufacturing; strict local content requirements mean that they will have to set up shop in Qu\u00c3\u00a9bec. This is good for the Canadian [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[10,8],"tags":[928,59,169],"class_list":["post-3613","post","type-post","status-publish","format-standard","hentry","category-o-canada","category-wind-things","tag-quebec","tag-wind","tag-yay"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/pQNZZ-Wh","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/posts\/3613","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/comments?post=3613"}],"version-history":[{"count":0,"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/posts\/3613\/revisions"}],"wp:attachment":[{"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/media?parent=3613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/categories?post=3613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/scruss.com\/blog\/wp-json\/wp\/v2\/tags?post=3613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}